Develop ideas of where you could
incorporate the use of scenario planning in an organization
A good organization should have a workable
and clear scenario plan. I choose the stepping guide from JISC InfoNet (Ref: http://www.jiscinfonet.ac.uk/tools/scenario-planning/steps)
to implement our scenario planning.
Step 1: Scoping
Currently our library is providing a
service for student to come and borrow our private room for study. Many
students love this service and our rooms are always full. The 334 curriculum is
coming and we are facing a very serious problem, so many students but not
enough rooms.
Step 2: Trend Analysis
Now this room rental services is base on
first come first serve. Everyday we will see a line of students who standing
before the entrance of our library before we are open. They are all wait for
getting the key to get into a room once our door opened. However we found there
are so many people who take the key of the room, leaving their belonging in it,
and then leave this room. Sometimes they just leave it for several hours, or
even pass the key to their friends. Some students they can never get a room
just because they have morning class before library opening time. As a result
it makes our rooms not be fully utilized. We are starting to think of solution.
Step 3: Building Scenarios
We plan to provide an online booking system
which needed student unique ID to login. Therefore students can go to reserve
their room at anytime through internet. All the rooms have locks and can only
using their student library card to open. This student library card contains
their unique ID and they should put their card on the electronic reader to
verify. This electronic reader should check with the reservation table in
database and the student ID should match with this student library card ID, and
then open the door lock if it matches.
Step 4: Generate Options
This plan involve IT skills to develop a reliable
web site, door control system and smart card reader. We will find our
university IT department to ask for consultancy because they have implemented
similar project before.
Step 5: Test Options
We plan we will have a testing period after
this system is launched. It needs time for this system to running smooth, need
time to fixing minor and hidden software bugs, and need time for user to get
use this new system.
Step 6: Action Plan
After consult with university IT
department, we should write a tender for bidding from outsiders.

